'09•SRK-DB-087D
(9)  Checking the indoor electrical equipment
(a)  Indoor PCB check procedure
(b)  Outdoor unit
Is  there  voltage  between  terminal 
blocks 
①
 and 
②
 ? (AC 220/230/240 
V)
Indoor  electrical  components 
are normal.
Is  the  voltage  between  terminal 
blocks 
②
 and 
③
 oscillating between 
DC 0 and 20V?
Inspect  power  source 
for outdoor unit.
Replace fuse.
Replace indoor PCB.
Is the fuse burnt out? (3.15 A)
NO
YES
YES
NO
YES
NO
(b)  Indoor unit fan motor check procedure
1)  Indoor PCB output check
① ④ ⑤
2)  Fan motor resistance check
⑥⑤④③②①
⑥⑤④③②①
FM
i
DC15V
Indoor PCB 
DC308-336V
DC several V
(4-6 V)
CNU
(–)
GND
Blue
Yellow
 White
Black
Red
Sensor
Operation 
mode
Phenomenon
Shortcircuit Disconnected wire
Heat exchanger 
sensor
Cooling
Heating
Ourdoor air 
temperature sensor
Cooling
Heating
Discharge pipe  
sensor
All modes
Measuring point Resistance when normal
①
−
③
−
④
−
③
−
Measuring 
point
Voltage range when 
normal
①
−
③
④
−
③
⑤
−
③
Defrosting is performed for 10 minutes at approx. 35 minutes.
Defrosting is performed for 10 minutes at approx. 35 minutes.
k
M
-
-