Do you have a question about the Miura Colormetry CMU-324HE and is the answer not in the manual?
Brand | Miura |
---|---|
Model | Colormetry CMU-324HE |
Category | Boiler Supplies |
Language | English |
Guidelines for moving or selling the MIURA water treatment equipment.
Warning against unauthorized customization of the water treatment equipment.
Ensures secure drain piping to prevent electric shock or burns.
Requirements for proper grounding and power supply for safety.
Precautions for installing the main unit securely and safely.
Information on legal requirements for exporting MIURA equipment.
Emphasizes correct installation and operator understanding of manuals.
Advice on preventing condensation and managing potential water leaks.
Verification requirements for water treatment equipment installation.
Notification requirements based on local environmental regulations.
Regulations regarding connection to waterworks and feed water tanks.
Requirements for preserving and maintaining building sanitation standards.
Measures to maintain hygiene and safety in accordance with laws.
Handling and management of substances according to applicable laws.
Proper handling and storage of hazardous chemical substances.
Notification requirements for using or storing specific substances.
Proper storage management for deleterious substances.
Notification requirements for specific chemical substance releases.
Risk assessment and handling of chemical substances in the workplace.
Defines danger, warning, and caution levels for safety information.
Meanings of symbols used in the manual for instructions and warnings.
Essential checks and conditions required before installing the device.
Step-by-step guide for mounting the main unit onto a wall.
Instructions for connecting the drain tube, ensuring proper drainage.
Steps to connect the feed water tube and assemble the filter casing.
Proper methods for organizing and securing electrical wires to prevent damage.
Diagram showing the arrangement of terminal blocks on the main unit circuit board.
Explanation of the grounding symbol and its importance for safety.
How to connect external signals for monitoring control.
Connecting relays for remote alarm notification.
Specific wiring diagram for BG1/BJ1/BL11/BM11 type controllers.
Specific wiring diagram for XJ1 type controllers.
Specific wiring diagram for BK type controllers.
Output signal for reagent cartridge replacement alerts.
Output signal for the device's washing process status.
Connecting the device to the DS-NET for data communication.
Wiring for outputting concentration alarm signals.
Wiring for analog output of concentration data.
Safety warnings and cautions for handling reagent cartridges.
Checklist for verifying the physical installation of the device.
Checklist for verifying the correctness of all electrical wiring.
Checklist for confirming the integrity of all piping connections.
Configuration of the device using DIP switches before operation.
Procedures after powering on the device, including initial messages.
Automatic test mode to confirm device operation.
Table listing all configurable parameters and their settings.
Setting current date, time, and monitoring frequency.
Defining the scheduled period for monitoring operations.
Configuring remote signal input for monitoring control and delay.
Setting alarm points, retry logic, judgment, and output types.
Managing the replacement date for reagent cartridges.
Configuring remote signal ID, communication ID, and output types.
Adjusting concentration valid time and output correction values.
Setting time to wait after washing before blank monitoring.
Procedures to confirm that monitoring functions correctly.
Procedure to test the alarm system and remote output signals.