EasyManua.ls Logo

Miura Colormetry CMU-324HE User Manual

Miura Colormetry CMU-324HE
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTALLATION
AND
START-UP OPERATION MANUAL
Colormetry
CMU-324HE
Water Hardness Leakage
(For outside Japan)
MIURA CO.,LTD.
This document was formulated in Japan. Comply with
the regulations and standards of the country of use
regarding installation and usage.
The specifications of products and components may
vary with country of use and the site situation.
INFORMATION IN THIS MANUAL MAY BE
CHANGED WITHOUT NOTICE.
Manual Code No. S855-080-8911
Question and Answer IconNeed help?

Do you have a question about the Miura Colormetry CMU-324HE and is the answer not in the manual?

Miura Colormetry CMU-324HE Specifications

General IconGeneral
BrandMiura
ModelColormetry CMU-324HE
CategoryBoiler Supplies
LanguageEnglish

Summary

Safety Information for Installation and Use

Relocation and Resale

Guidelines for moving or selling the MIURA water treatment equipment.

Prohibition of Modification

Warning against unauthorized customization of the water treatment equipment.

Drain Piping Safety

Ensures secure drain piping to prevent electric shock or burns.

Electrical Work Safety

Requirements for proper grounding and power supply for safety.

Main Unit Installation Safety

Precautions for installing the main unit securely and safely.

Exporting from Japan Regulations

Information on legal requirements for exporting MIURA equipment.

Water Treatment Equipment Installation Best Practices

Emphasizes correct installation and operator understanding of manuals.

Dew Condensation and Water Leakage Measures

Advice on preventing condensation and managing potential water leaks.

Related Laws and Regulations for Equipment

Water Quality Pollution Control Act

Verification requirements for water treatment equipment installation.

Regional Pollution Prevention Ordinance

Notification requirements based on local environmental regulations.

Water Supply Act

Regulations regarding connection to waterworks and feed water tanks.

Act on Maintenance of Sanitation in Buildings

Requirements for preserving and maintaining building sanitation standards.

Food Sanitation Act

Measures to maintain hygiene and safety in accordance with laws.

Industrial Safety and Health Act

Handling and management of substances according to applicable laws.

Poisonous and Deleterious Substances Control Act

Proper handling and storage of hazardous chemical substances.

Fire Service Act

Notification requirements for using or storing specific substances.

Laws for Chemical Management and Handling

Poisonous and Deleterious Substances Control Act (Chemical)

Proper storage management for deleterious substances.

Pollutant Release and Transfer Register (PRTR) Act

Notification requirements for specific chemical substance releases.

Industrial Safety and Health Act (Chemical Handling)

Risk assessment and handling of chemical substances in the workplace.

Introduction and Safety Symbols

Safety Warning Classification

Defines danger, warning, and caution levels for safety information.

Explanation of Notation Symbols

Meanings of symbols used in the manual for instructions and warnings.

Installation Procedure Overview

Pre-installation Checklist

Essential checks and conditions required before installing the device.

How to Install the Main Unit

Step-by-step guide for mounting the main unit onto a wall.

Piping Installation Details

Drain Piping Installation

Instructions for connecting the drain tube, ensuring proper drainage.

Feed Water Piping Installation

Steps to connect the feed water tube and assemble the filter casing.

Wiring and Connection Guide: Wire Routing

Routing the Wires

Proper methods for organizing and securing electrical wires to prevent damage.

Wiring and Connection Guide: Terminal Blocks and Grounding

Terminal Block Layout

Diagram showing the arrangement of terminal blocks on the main unit circuit board.

Functional Grounding Notation

Explanation of the grounding symbol and its importance for safety.

Wiring and Connection Guide: Remote Signal and Alarm Outputs

Remote Signal Input Wiring

How to connect external signals for monitoring control.

Remote Alarm Output Wiring

Connecting relays for remote alarm notification.

Wiring and Connection Guide: Controller Specific Wiring

Wiring to BG1/BJ1/BL11/BM11 Controllers

Specific wiring diagram for BG1/BJ1/BL11/BM11 type controllers.

Wiring to XJ1 Controller

Specific wiring diagram for XJ1 type controllers.

Wiring to BK Controller

Specific wiring diagram for BK type controllers.

Wiring and Connection Guide: Reagent Cartridge Output

Reagent Cartridge Replacement Output Wiring

Output signal for reagent cartridge replacement alerts.

Wiring and Connection Guide: Water Passing Output

Water Passing Output Wiring

Output signal for the device's washing process status.

Wiring and Connection Guide: DS-NET Communication

DS-NET Communication Wiring

Connecting the device to the DS-NET for data communication.

Wiring and Connection Guide: Concentration Alarm and Analog Outputs

Concentration Alarm Output Wiring

Wiring for outputting concentration alarm signals.

Concentration Analog Output Wiring

Wiring for analog output of concentration data.

Reagent Cartridge Installation

Reagent Cartridge Handling Precautions

Safety warnings and cautions for handling reagent cartridges.

Final Checks Before Start-up Operation

Pre-Start-up Installation Checks

Checklist for verifying the physical installation of the device.

Pre-Start-up Wiring Checks

Checklist for verifying the correctness of all electrical wiring.

Pre-Start-up Piping Checks

Checklist for confirming the integrity of all piping connections.

Setting and Start-up Operation: DIP Switch Configuration

Setting the DIP Switch

Configuration of the device using DIP switches before operation.

Setting and Start-up Operation: Power On and Initial Checks

Turning the Power On and Initial Checks

Procedures after powering on the device, including initial messages.

Setting and Start-up Operation: Status Verification Test Mode

Status Verification Test Mode

Automatic test mode to confirm device operation.

Setting and Start-up Operation: Setting Items Overview

Setting Items Overview

Table listing all configurable parameters and their settings.

Setting and Start-up Operation: Basic Operation Settings

Date, Time, and Monitoring Interval Settings

Setting current date, time, and monitoring frequency.

Monitoring Start and Stop Times

Defining the scheduled period for monitoring operations.

Remote Signal Function and Delay

Configuring remote signal input for monitoring control and delay.

Setting and Start-up Operation: Alarm and Cartridge Settings

Concentration Alarm Configuration

Setting alarm points, retry logic, judgment, and output types.

Reagent Cartridge Replacement Date Setting

Managing the replacement date for reagent cartridges.

Setting and Start-up Operation: Communication and Output Settings

Communication and Signal Settings

Configuring remote signal ID, communication ID, and output types.

Concentration Output Settings

Adjusting concentration valid time and output correction values.

Blank Waiting Time Setting

Setting time to wait after washing before blank monitoring.

Setting and Start-up Operation: Monitoring Operation Verification

Verifying Monitoring Operation

Procedures to confirm that monitoring functions correctly.

Setting and Start-up Operation: Alarm Function Verification

Verifying Alarm Function

Procedure to test the alarm system and remote output signals.

Related product manuals