EasyManua.ls Logo

Monogram Vent hood - Design Information; Table of Contents; Optional Accessories; Product Dimensions and Clearances

Monogram Vent hood
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Design Information
3
PRODUCT DIMENSIONS AND CLEARANCES
OPTIONAL ACCESSORIES
ZX14SDSS, optional stainless steel duct cover is
available for ceiling heights greater than 10 ft.
and up to 14 ft.
Order the optional duct cover at the same time as
the vent hood and have on site before installation.
The vent hood must be installed 25-1/2” min. and 30”
max. above the cooking surface. Use the decorative duct
cover to conceal ductwork running from the top of the
hood to the ceiling. The supplied 2-piece duct cover is
sized to reach 8 ft. to 10 ft. ceiling heights.
The hood installation height, from the cooking surface
to the bottom of the hood, depends upon ceiling height.
10"
*Height
to Ceiling
35-5/8"
25"
*The supplied duct cover fits 8 ft. to 10 ft. ceilings.
Cooking surface to bottom of hood should be:
• 25-1/2" max. for 8 ft. ceiling height.
• 25-1/2" to 30" for 9 ft. ceiling height.
• 30" min. for 10 ft. ceiling height.
Plan the installation height carefully to avoid unsightly
gaps above the hood.
CONTENTS
Design Information
Product Dimensions and Clearances .............................. 3
Optional Accessories ........................................................ 3
Advance Planning,
Ductwork, Framing......................................................... 4
Power Supply .................................................................... 4
Duct Fittings......................................................................5
Installation Preparation
Tools and Materials Required .......................................... 6
Remove the Packaging ..................................................... 6
Check Installation Hardware ........................................... 7
Ductwork, Wiring Locations ............................................ 7
Installation Instructions
Step 1, Install Framing for Hood Support ...................... 8
Step 2, Install Mounting Brackets.................................... 8
Step 3, Install Duct Bracket.............................................. 9
Step 4, Install the Hood ................................................... 9
Step 5, Connect Ductwork ............................................. 10
Step 6, Connect Electrical.............................................. 10
Step 7, Install Duct Covers ............................................. 10
Step 8, Install Filters ....................................................... 11
Step 9, Finalize Installation ............................................ 11
Note: Duct covers must be installed as shown in
this book. Do not “build-in” the duct cover. If
service is required, the duct cover must be
removed to access hood components.
Installation
Height Depending
on Ceiling Height
36" Min.

Other manuals for Monogram Vent hood