EasyManua.ls Logo

MOODY Eclipse 43 - Recommissioning; Cooling system; Lubricating system; Fuel system

Default Icon
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electrics & general
1 Disconnect yacht's batteries and pull battery cables well clear of terminals.
Remove batteries.
2 Spray exposed electrics and wiring terminations with WD40 (or similar), pay
particular attention to battery master switch.
3 Ensure batteries are moved from items of equipment such as echo-sounders,
radios, logs, etc.
4 Remove and store compass.
5 Remove and store
sprayhoods
(as sails).
6 Completely dry out toilet installation after testing. Ensure that the lever is inthe
'DRY
BOWL'
position and that the drain plug from the base of the toilet is
removed. If in salt water areas, flushing with fresh water is recommended.
7 Ensure domestic fresh water system is drained. Water tanks should be driedout
where possible. The non-return valve on the outlet side of the calorifier must
be removed to allow it to be drained. Refit valve after draining.
Recommissioning_________________________
Cooling
system____________________________________
(Sea Water)Close drain taps, open sea water inlet valve.
(Fresh Water)Fill cooling system with coolant.
Lubricating
system____________________________________
Drain inhibiting oil, replenish sump with lubricating oil.
Fuel
system________________________________________
Bleed fuel lines as necessary.
Exhaust
system______________________________________
Remove tape blanks and reconnect exhaust hose.
Issue 3 Page 7.3

Table of Contents

Related product manuals