Moo
 Guitar Service Manual
           Example
Tape protection card under bridge to protect finish incase bridge is lowered against 
guitar. This will remain until final inspection.
Hardware installation:
Pull (1) of each of the following: Pot assembly, Switch assembly, XLR assembly 
(see Fig. B, C, and D for pre-assembly build instructions).
inspect each of these for quality solder connections (i.e. no cold solder joints, no 
ex
osed wire to risk shortin
.
inspect wiring for correct connections.
Add one rubber insulation pad on bottom of each pot housing.
Clip the locating tabs off each pot.
Depending on thickness of UI wood, place either a small lock washer or a large 
lockwashe
 between each of the 5 
ots and the 
uitar cavit
 wood.
Place pots through correct panel hole so that washer allows just enough bushing 
thread for one nut and washer on the outside of the guitar. If too many threads are 
left, a thicker lock washer should have been used. This will be obvious once knobs 
are installed and the nuts are visible underneath. Instead the knob should stop just 
above the guitar surface, as seen in photo.
Continue installing all pots with lock washers, nuts, and washers. When all 5 are 
installed, correct the pots' orientation and lightly tighten the nuts with a 10mm hex 
driver. Their correct orientation should have all pot leads pointing in the direction 
of the pick up cavities. Please be cautious not to over tighten. This will cause the 
finish to se
arate from the wood.