Report No.: 300-ELAB-2381-EPA
Date: 06.09.2019
Initials: JSA/MGJN
Page 9 of 25
300-ELAB-2381-EPA
Summary of the dummy HF and LF test the 21-02-2019
Data logger file Id: 2019-02-21_08-45-13
12:10:00
Ignition of the Cold Start part test using the gas torch for 1 minute. The air valve is
100% open (full action 45 mm). 0,461 kg of kindling (10% moisture wb) and 0,680
kg start-up fuel (16,3% moisture wb) was entered
12:12:30
Ignition is over, the door is closed after 1½ min ajar. The air valve is maintained at
100% open
12:37:05
End of Kindling+Start-up at 331 grams of embers, taring of the platform scale,
evening out of the embers
12:37:10
Start of dummy High Fire using 2,307 kg firewood (16.9% moisture wb)
12:37:45
End of loading time after 35 seconds
13:39:00
The door was closed, and the air valve was adjusted from fully open (45 mm) to 10
mm open
13:37:00
End of dummy High Fire cycle at 250 grams of embers, taring of the platform scale,
evening out of the embers, the air valve still in position 100% open for ignition and
begin of Low Fire test using in total 2,806 kg of firewood (17,7% moisture wb).
13:37:45
End of the loading time after 45 seconds
13:39:00
The air valve was reduced from fully open, 45 mm 10 mm open
13:44:30
At platform scale reading of 2,500 kg, corresponding to 11% of the fuel load had
been combusted, the air valve was further reduced from 10 mm to 8 mm open
14:37:00
Change of the filter holder arrangement in the split extraction train at the hour at
gas meter reading 34291,13 normal litres
15:19:30
The fire is out at platform scale reading 0,270 kg
16:03:10
The Low Fire test is over at platform scale reading 0 kg
Please find the corresponding sequence of images in appendix 4