EasyManua.ls Logo

Movement EDGE - Maintenance Routines and Frequency

Movement EDGE
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
MAINTENANCE GERAL INFORMATION
MAINTENACE ROUTINES
Movement projected all ites equipments with componentes and
system that provides alow maintenance.
The following instructions have a guide of maintenance with a
character more preventive than corrective. The table below will
serve as a control ass well to take notes of the done maintenances.
As general recommendation to keep the equipmenet: It shoulde
not be exposed to solar light incidence directly or indirectly, the
weather actions (rain, wind, sand/dust), elements or abrasive
productions and/or corrosives andchemical elements in general.
1 - ,Check the condition and
adjust if necessary: connections,
clamps, regulation pins, pulleys,
and load pins.
2 - Check the condition of the
bars and articulated levers
3 - Check and tighten
nuts and bolts,
if necessary
4 - Inspect anti-slip
surfaces
5 - Cleaning of upholstry
6 - Cleaning or lubrication
of the guides of the weights
7 - Cleaning of the structure
(unlubricated metal parts)
DAILY
WEEKLY
WEEKLY
WEEKLY
DAILY
MONTHLY OR WHEEN
NECESSARY
EVERY 6 MONTHS
OR WHEN NECESSARY
WEEKLY
EVERY 3 MONTHS
EVERY 3 MONTHS
EVERY 3 MONTHS
WEEKLY
EQUIPMENT AND
COMPONENTS
FREQUENCY
HEAVY USE
MODERATE USE
Grandes Academias/Clubes/
Centros de Treinamento
Pequenas Academias/Residências/
Clínicas de Reabilitação
MONTHLY OR WHEEN
NECESSARY
EVERY 6 MONTHS
OR WHEN NECESSARY

Other manuals for Movement EDGE

Related product manuals