Proper handling, placement, anchoring, and initial flushing of hydrants.
Guidelines for opening and closing hydrants, emphasizing full open/closed positions.
Procedures for regular inspection of external condition, valve leakage, and barrel/drain leakage.
Checks for non-draining hydrants, drainage verification, and general maintenance tasks.
Step-by-step guide for safely disassembling and removing internal hydrant components.
Detailed procedure for replacing the valve rubber using specific part numbers and diagrams.
Steps to perform a hydrostatic test, checking for leaks at various connection points.
Guidance on installing a 100mm Storz adapter onto a pumper nozzle.
Procedure for installing the Storz connector onto the hydrant pumper nozzle.
Proper handling, placement, anchoring, and initial flushing of hydrants.
Guidelines for opening and closing hydrants, emphasizing full open/closed positions.
Procedures for regular inspection of external condition, valve leakage, and barrel/drain leakage.
Checks for non-draining hydrants, drainage verification, and general maintenance tasks.
Step-by-step guide for safely disassembling and removing internal hydrant components.
Detailed procedure for replacing the valve rubber using specific part numbers and diagrams.
Steps to perform a hydrostatic test, checking for leaks at various connection points.
Guidance on installing a 100mm Storz adapter onto a pumper nozzle.
Procedure for installing the Storz connector onto the hydrant pumper nozzle.