EasyManua.ls Logo

NCR FastLane SelfServ 7358-K112 - Page 14

NCR FastLane SelfServ 7358-K112
39 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-Bag Bagwell Upgrade 11
c. Lift Bagwell up and away from the Core Cabinet. The upper screw heads will
pass through the key holes in the Bagwell side support.
Note: The two (2) upper screws may be left in place if a new Bagwell will be
installed in the same orientation. Otherwise, remove the screws from the side of
the Core.

Related product manuals