EasyManua.ls Logo

NCR FastLane SelfServ 7358-K112 - Page 24

NCR FastLane SelfServ 7358-K112
39 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-Bag Bagwell Upgrade 21
5. If not already present, partially thread the two (2) upper screws on the Bagwell side
of the Core. Leave approximately ¼ inch of the threads exposed.
6. Mate the new Bagwell to the Core by lifting the frame up and over the partially
threaded screws.
Note: Ensure that the two frontmost key holes on the Bagwell are used.

Related product manuals