EasyManua.ls Logo

NetApp AFF A150 - Page 489

NetApp AFF A150
808 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
mcc1A::> metrocluster operation show
Ê Operation: heal-root-aggregates
Ê State: successful
ÊStart Time: 7/29/2016 20:54:41
Ê End Time: 7/29/2016 20:54:42
Ê Errors: -
8. On the impaired controller module, disconnect the power supplies.
Move and replace hardware - AFF A700 and FAS9000
Move the fans, hard drives, and controller module or modules from the impaired chassis
to the new chassis, and swap out the impaired chassis from the equipment rack or
system cabinet with the new chassis of the same model as the impaired chassis.
Step 1: Remove the power supplies
Steps
Removing the power supplies when replacing a chassis involves turning off, disconnecting, and then removing
the power supply from the old chassis.
1. If you are not already grounded, properly ground yourself.
2. Turn off the power supply and disconnect the power cables:
a. Turn off the power switch on the power supply.
b. Open the power cable retainer, and then unplug the power cable from the power supply.
c. Unplug the power cable from the power source.
3. Press and hold the orange button on the power supply handle, and then pull the power supply out of the
chassis.
When removing a power supply, always use two hands to support its weight.
487