EasyManuals Logo

NetApp E2860 User Manual

NetApp E2860
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
(1) Cache Active LED
7. From the Home page of SANtricity System Manager, select View Operations in Progress. Wait for all
operations to complete before continuing with the next step.
8. Power down the controller shelf.
a. Turn off both power switches on the controller shelf.
b. Wait for all LEDs on the controller shelf to turn off.
Step 2: Remove controller canister
Remove the controller canister so you can add the new host interface card.
Steps
1. Label each cable that is attached to the controller canister.
2. Disconnect all the cables from the controller canister.
To prevent degraded performance, do not twist, fold, pinch, or step on the cables.
3. Confirm that the Cache Active LED on the back of the controller is off.
The green Cache Active LED on the back of the controller is on when cached data needs to be written to
the drives. You must wait for this LED to turn off before removing the controller canister.
(1) Cache Active LED
4. Squeeze the latch on the cam handle until it releases, and then open the cam handle to the right to release
the controller canister from the shelf.
4

Other manuals for NetApp E2860

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NetApp E2860 and is the answer not in the manual?

NetApp E2860 Specifications

General IconGeneral
BrandNetApp
ModelE2860
CategoryServer
LanguageEnglish

Related product manuals