LCD Setting
After pressing and holding ENTER button for 3 seconds, the unit will enter setting mode. Press “UP” or “DOWN”
button to select setting programs. And then, press “ENTER” button to confirm the selection or ESC button to
exit.
Setting Programs:
Escape
Output source priority:
To configure load power
source priority
Solar first
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to power
all connected loads, battery energy will
supply power the loads at the same
time.
Utility provides power to the loads only
when any one condition happens:
- Solar energy is not available
- Battery voltage drops to low-level
warning voltage or the setting point in
program 12.
Utility first (default)
Utility will provide power to the loads as
first priority.
Solar and battery energy will provide
power to the loads only when utility
power is not available.
SBU priority
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to power
all connected loads, battery energy will
supply power to the loads at the same
time.
Utility provides power to the loads only
when battery voltage drops to either
low-level warning voltage or the setting
point in program 12.
Maximum charging
current: To configure
total charging current
for solar and utility
chargers.
(Max. charging current
= utility charging
current + solar charging
current)
Available options in 1KW/2KW
10A
20A
30A
40A
50A (default)
14