EasyManua.ls Logo

Nidec NVS-07 - Operation - Before Use; Control Panel and Switches

Nidec NVS-07
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
Item Quantity Remarks
Main unit 1
Supporting plate 1
Front cover 1
Double-end wrench 2 17 x 13; used to tighten or loosen the nozzle and screws
Allen wrench 1 M2.5; used to replace stainless steel wire for clay cutter
Instruction manual 1
Warranty card 1
English
The unit weight is approximately 140 kg.
Have three or more people unpack this unit.
(Unpacking procedure)
• Remove the cardboards and cushioning materials
around the unit.
Cut o󰀨 the cardboard around the bottom of the unit.
• Slightly tilt the unit to remove two bases that support
the unit.
• Unlock all four wheels.
• Slowly push the unit forward while holding it securely.
Then unload it from the pallet.
The toolbox contains the clay roller shelf, tools,
instruction manual, and warranty card.
● Since the NVS-07 is very heavy, exercise su󰀩cient care when unpacking so the unit does not drop.
Cut o󰀨 the cardboard
around the bottom of
the unit.
Slightly tilt the main unit to
remove the base (also the
opposite one).
Slowly unload the unit from the pallet.
(Installation)
Install the unit. In a at location for rattle-free operation
and lock the casters.
• Place the clay roller shelf in the groove and support
below the nozzle.
• Fit the front cover to the nozzle
Items included
Installation and preparation
Danger