EasyManua.ls Logo

NOA STUDIO - Assembly Steps; Step 1: Prepare Controller Box; Step 2: Attach Frame and Poles

Default Icon
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
noahome.com
STEP 1
Take the N2 controller box from the installation shelf and put it aside.
Separate the installing shelf and controlling box shelf. Remove the two central beams inside.
STEP 2
Use four M6x10 hexagon flat round head screws (part #15) to fix the frame and standing pole. Repeat for opposite side. (total of 8 pcs)
Use two M6x14 hexagon flat round head screws (part #16) to fix the side panel and frame. Repeat for opposite side. (total of 4 pcs)
M6x10 screws (part #15)
4 pcs
M6x14 screws (part #16)
2 pcs