MANUAL PART NO. D301310 ISS 0
INSTALLATION, COMMISSIONING AND SERVICING
MANUAL
PHOTON
GAS FIRED UNIT HEATER
Please read this document carefully before commencing installation, commissioning and/or servicing.
Leave it with the end user/site agent to be placed in their premises technical file after installation.
WARNING
Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury or death.
All work must be carried out by appropriately qualified persons.
The manufacturer does not take any responsibility in the event of non-observance of the regulations concerning the connection of the apparatus causing a
dangerous operation possibly resulting in damage to the apparatus and/or environment in which the unit is installed.
These appliances meet the following EC directives
(EU) 2016/426: GAR
(EU) 2016/2281 ErP
DIR 2014/30/EU:EMC
DIR 2014/35/EU:LVD
DIR 2006/42/EC:MD
PH45-LITKIT-UK
Literature Kit UK
ErP
2021
ErP Lot 21
Seasonal Efficiency and
NOx compliant

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Nortek REZNOR PHOTON 100 and is the answer not in the manual?

Nortek REZNOR PHOTON 100 Specifications

General IconGeneral
Input BTU/hr100, 000 BTU/hr
Heating Capacity80, 000 BTU/hr
Thermal Efficiency80%
Fuel TypeNatural Gas or Propane
Voltage120V

Summary

Installation Guidance

Installer Notices and Safety

Critical information and warnings for personnel undertaking installation and servicing.

Health and Safety Precautions

Covers essential safety measures, including gas leak procedures and general handling precautions.

Gas and Electrical Connections

Guidelines for safe gas connection and electrical wiring of the unit.

Commissioning and Operation

Pre-Start Checks and Startup

Essential checks and steps for safely initiating the unit's operation.

Commissioning Checks and Handover

Verification procedures, gas conversion, and user handover protocols.

Maintenance and Component Replacement

Troubleshooting and Spare Parts

Fault Finding Procedures

Diagnostic flowcharts and checks for identifying and resolving operational issues.

Related product manuals