Read the installation manual completely before use and comply with all safety notices and warnings.
Verify electrical supply, cables, fuses, and pit dimensions for correct installation.
List of necessary tools for installation, including welding equipment.
Details on required lifting equipment, specifying capacity and fork length.
Specifications for cables required for electrical connections.
Check all operating modes of the leveller upon completion of installation work.
Procedures for initial use, user instruction, and restrictions on software changes.
Procedure for dismantling the leveller, to be carried out by a qualified technician.
Requirements for personnel performing installation, including qualifications and training.
Details on required mains power supply, fuse, motor capacity, and electrical cable conduit.
List of items required for installation, including leveller, controls, and manuals.
Using a forklift for preparation, including specifications for wooden beams.
Using lifting equipment for preparation, specifying capacity and safety precautions.
Shows positioning and alignment of the frame CZ with dimensional tolerances.
Instructions for fixing the frame CZ using bolts and plates, with specified tolerances.
Attaching components to the frame CZ using screws, brackets, and specific tools.
Fastening the leveller to the frame using bolts and plates, ensuring correct alignment.
Diagram of electrical connections (L1, L2, L3, N, PE) and wire color coding.
Connecting the control unit to the leveller and securing hydraulic hose connections.
Routing cables and connecting them to the control unit, ensuring proper management.
Installing the control panel at the specified height of approximately 1350 mm.
Mounting dimensions for different control units (Novo i-Vision, SuperVision 5).
Welding anchors to reinforcement or dowels, with safety notes on galvanized components.
Instructions for pouring concrete, specifying grade (C20/25) and shuttering.
Painting welded seams to prevent rust and details on front plate usage with options.
Pre-frame construction or delivery by Novoferm, and removal of braces.
Positioning and fixing the leveller to the frame BZ with specified dimensions and tolerances.
Installation for Frame DZ with concrete embedding height 100-160 mm.
Installation for Frame DZ with concrete embedding height 161-250 mm.
Fixing the leveller to the frame EZ, maintaining a 10 mm gap, and pouring concrete.
Steps for removing lifting eyes, transportation immobilisers, and spacers before commissioning.
Leveller testing, trial run, operator instruction, and safety feature checks.