EasyManua.ls Logo

NuTone CH515

NuTone CH515
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
Installation
Each NuTone Central Cleaning System comes packed with
a Planning & Installing Guide. Whatever your home layout –
multi-level, two-story or ranch – we have a system to meet
your needs. As few as three or four inlets can take care of an
average size home. Once you’ve determined the right system
for you, a typical system can be installed in a day or less.
Just choose whether you want to do-it-yourself or hire a
professional installer.
For New Construction
Installation is simple! Plan the location of the power unit
and inlets with your building or contractor. Tubing, inlets and
electrical hook-up can be made before drywall, plaster or
finished flooring is in place. You can even “pre-tube” your home,
then select and install the power unit later!
For Existing Construction
Just determine the number and location of inlets and cutting
through drywall can be kept to a minimum. Tubing can be run
through cold air returns, closets and stairwells.
NOTE: NuTone Central Cleaning Systems are not designed
for wet pick-up.

Related product manuals