NÜVE SANAYİ MALZEMELERİ İMALAT VECARET A.Ş.
TK 120 / TK 252 / TK 600
CLIMATIC TEST
CABINETS
USER’S MANUAL
Z14. K 25 258 Rev.No: 06 Rev.Date: 01/2016
Question and Answer IconNeed help?

Do you have a question about the NUVE TK 120 and is the answer not in the manual?

NUVE TK 120 Specifications

General IconGeneral
Shelf Number2
Resolution0.1 °C
Chamber Volume120 L
Power Supply230 V 50/60 Hz
Input TypePt100 temperature sensor
Power Supply (Controller)230 V 50/60 Hz
MountingPanel mounting

Summary

Use and Function

Technical Specifications

Technical Specifications Table

Detailed technical specifications for the climatic test cabinets.

Temperature-Humidity Graph

Visual representation of the temperature and humidity operating range.

Optional Accessories

List of available optional accessories for the climatic test cabinets.

General Presentation

Overview of the climatic test cabinet's physical components and design.

Installation Procedure

Lifting and Transport

Guidelines for safely lifting and transporting the climatic test cabinet.

Unpacking

Instructions for unpacking the climatic test cabinet and checking contents.

Positioning

Recommendations for placing the climatic test cabinet in its operational environment.

Prior to Operation

Important checks and preparations before operating the climatic test cabinet.

Precautions and Limitations of Use

Safety warnings and operational limits for using the climatic test cabinet.

Water Filling

Procedure for filling the water reservoir for humidity functions.

Operating Principles

Switching On

Instructions on how to power on the climatic test cabinet.

Auxiliary Control Panel

Description of the auxiliary control panel and its ports (Printer, RS 232).

Display and Control Panel

Detailed explanation of the climatic test cabinet's display and control buttons.

Setting and Operation Cycles

Guide to setting up and running operational cycles on the cabinet.

Setting Language, Date, and Time

Procedure for configuring the cabinet's language, date, and time settings.

Initial Power-On State

Description of the display state immediately after switching on the cabinet.

Programming Operation Cycles

Detailed steps for programming test cycles, including parameters and power failure settings.

Printer Settings

Configuration options for the printer connection and logging interval.

PT-100 Sensor Display

How to view PT-100 sensor readings on the display.

Illumination Settings

Configuration of lighting periods and activation for the chamber.

Completion of Operation

Steps to follow after completing an operational cycle, including shutdown.

Periodic Maintenance and Cleaning

Monthly Maintenance

Cleaning procedures for the chamber interior on a monthly basis.

Quarterly Maintenance

Cleaning the condenser unit every three months for optimal performance.

Annual Checks

Recommendation for annual calibration and system checks by technicians.

Disposal Management Concept

Troubleshooting

Errors Recognized by Control System

Explanation of error messages displayed by the control system and their solutions.

Electrical Circuit Diagrams

Labels and Warnings

Related product manuals