EasyManua.ls Logo

OfiTE 171-193-6K User Manual

OfiTE 171-193-6K
27 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Permeability Plugging Tester with LCM
Receiver, 6000 psi
#171-193-6K: 115 Volt
#171-193-6K-1: 230 Volt
Instruction Manual
Updated 6/14/2019
Ver. 4
OFI Testing Equipment, Inc.
11302 Steeplecrest Dr. · Houston, Texas · 77065 · U.S.A.
Tele: 832.320.7300 · Fax: 713.880.9886 · www.ote.com
©
Copyright OFITE 2017
Question and Answer IconNeed help?

Do you have a question about the OfiTE 171-193-6K and is the answer not in the manual?

OfiTE 171-193-6K Specifications

General IconGeneral
BrandOfiTE
Model171-193-6K
CategoryTest Equipment
LanguageEnglish

Summary

Intro

Description

Specifications

Components

Safety

Temperature

The heating jacket, test cell, and pressure assemblies will be very hot during testing. Handle these components with care.

Pressure

Always pressurize with either Carbon Dioxide or Nitrogen. Do not use Nitrous Oxide (NO2), Oxygen (O2), or compressed air.

Equipment

Inspect all o-rings before every test. Discard any that show signs of damage or wear.

Cell Corrosion

Test fluids under high temperature and pressure can corrode the cell body and caps. Carefully inspect the cell body and caps for corrosion.

Pump

Quick Start

Preparation

Cell Assembly

Testing

Starting a Test

Steps to begin the testing procedure, including CO2 bulb insertion and setting back pressure.

Ending a Test

Data

Cell Cap Assembly

Piston Assembly

Maintenance

Regulator Maintenance and Troubleshooting

Diagrams Permeability Plugging Tester

Diagrams Test Cell

Warranty and Return Policy

Warranty

OFITE's warranty terms, limitations, and conditions for products.

Returns and Repairs

Procedures for returning items, repair process, and associated fees.