EasyManua.ls Logo

Oki APR-5000 - Page 12

Oki APR-5000
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.okinternational.com - 11 - P/N 7000-1370, Revision B
The main unit is very heavy. Please uncrate it with 2 people.
DO NOT LIFT THE MAIN UNIT BY THE RAILS.
LIFTING BY THE RAILS WILL DAMAGE THEM!
III. SET-UP PROCEDURES
A. APR-5000 Main System
Prior to performing initial set-up, unpack all accessories from their shipping containers.
Ensure that your APR-5000 has arrived complete by verifying that all of the accessories
listed in Section II of this manual have been included. After all components are located,
setup can then begin.
1. Remove the APR-5000 Main Unit and all accessories from their shipping
containers.
When setting up this equipment, be sure to arrange it in a position that allows the user
to operate this machine in a comfortable, well-spaced environment.
IMPORTANT: Every APR-5000 Rework System has been factory assembled and
calibrated. Recalibration is not necessary after initial setup. However verifying
calibration and product functionality is strongly recommended prior to initial use. This
procedure is thoroughly discussed later in the manual in the section titled “Calibration.”
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com