EasyManua.ls Logo

OLT 8x8 Cedar - Top Framing: Side Wall Supports; Installing Front Vertical Posts; Attaching Side Top Supports

Default Icon
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 11
15. Install the Vertical Posts
from the Front Set of Part G. as
per Step 14.
16. Locate Part S - Side Top Supports with a
Bevel Edge. There are 2 pieces per side. Starting
with Support with only one Cleat on the end, position
on top of Side Wall Posts. Align Cleat end tight
against Corner Post and attach with with 2 - 2”
screws as shown above.
Part S -
Side Top Support
Bevel Cut
Cleats on
both ends
of Support.
1 Cleat
on end.
2 - 2”
Screws.
17. Position and attach Side Top Support with Cleats on both ends as per Step 16. Attach Corner
Post(s) End first with 2 - 2”. Align Supports equally on middle Side Post and attach with 2 - 3” screws.
Attach remaining interior Posts with 2 - 3” screw as shown above.
3”
screw
2”
screw
2”
screws
Middle Side Post
3”
screws
3”
screw

Related product manuals