EasyManua.ls Logo

OLT 8x8 Cedar User Manual

Default Icon
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
8x8 Cedar
Greenhouse
Assembly Manual
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 1
Revision #6
April 25th, 2017
In the event of a missing or broken piece, simply call the Outdoor Living Today
Customer Support Line @ 1-888-658-1658 within 30 days of the delivery of your
purchase. It is our commitment to you to courier replacement parts, free of charge,
within 10 business days of this notification. Replacement parts will not be
provided free of charge after the 30 day grace period.
Thank you for purchasing
an 8x8 Cedar Greenhouse.
Please take the time to
identify all the parts prior
to assembly.
Safety Points and Other Considerations
Our products are built for use based on
proper installation and normal residential
use, on level ground. Please follow the
instruction manual when building your
Greenhouse and retain the manual for future
maintenance purposes.
Some of the safety and usage measures you may wish to consider include:
-snow load ratings vary by geographical location. If heavy or wet snowfall occurs, it is advisable to sweep the
snow off the roof(s).
-if the product is elevated, any structural and building code requirements are solely the customer's
responsibility, and should be abided by.
-in high or gusty wind conditions it is advisable to keep the structure securely grounded.
-have a regular maintenance plan to ensure screws, doors, windows and parts are tight.
Customer agrees to hold Outdoor Living Today Partnership and any Authorized Dealers free
of any liability for improper installation, maintenance and repair.
Question and Answer IconNeed help?

Do you have a question about the OLT 8x8 Cedar and is the answer not in the manual?

OLT 8x8 Cedar Specifications

General IconGeneral
BrandOLT
Model8x8 Cedar
CategoryGreenhouse Kit
LanguageEnglish

Summary

Introduction and Safety Precautions

Welcome and Assembly Preparation

Thank you message and advice to identify parts before assembly.

General Safety and Usage Guidelines

Important safety points, considerations for wind, snow, and regular maintenance.

Customer Responsibility and Support

Customer agreement on liability and policy for obtaining replacement parts.

Greenhouse Parts Identification

Illustrated Parts List and Diagram

Visual identification and quantities of all wooden components for the 8x8 Cedar Greenhouse assembly.

Assembly Tools and Hardware

Provided Hardware Kit Components

List and illustration of hardware components included in the greenhouse kit, such as screws, hinges, and bolts.

Required Tools and Safety Equipment

Lists tools and safety gear needed for assembly, which are not provided in the kit.

Site Selection and Greenhouse Care

Choosing an Optimal Greenhouse Location

Guidance on selecting a site considering sunlight, drainage, access, and proximity to utilities.

Foundation and Flooring Material Options

Discussion of various foundation and flooring materials like dirt, sand, gravel, concrete, brick, and stone.

Cleaning and Maintenance Instructions

Instructions for cleaning polycarbonate sheets and maintaining the cedar wood structure.

Foundation Preparation: Sand & Gravel System

Material List for Foundation

List of materials required for the recommended sand and gravel foundation system.

Foundation Construction Steps Overview

Step-by-step instructions for preparing the site and building the foundation base.

Foundation Construction: Layout and Base

Laying Out 4x4 Foundation Framing

Detailed steps for positioning and securing the 4x4 cedar foundation framing on the prepared site.

Installing Landscape Clothe and Gravel

Instructions for placing landscape clothe and compacting gravel to complete the foundation base.

Wall Framing: Vertical Posts and Front Panels

Installing Vertical Corner Posts

Guidance on positioning and attaching the vertical corner posts (Part C) to the foundation.

Attaching Front and Side Wall Panels

Steps for installing the front solid wall panels (Part D) and side wall panels (Part E or F).

Wall Framing: Completing Side Walls

Attaching Additional Side Vertical Posts

Steps to attach the remaining side vertical posts (Part R) to the structure.

Positioning Side Wall Panels

Lay out and position side wall panels (Part E or F) for attachment.

Wall Framing: Connecting Wall Sections

Securing Side Wall Posts to Framing

Detailed method for attaching side wall posts (Part R) to the wall framing using supports and screws.

Connecting Completed Wall Sections

Instructions for lifting and connecting completed wall sections to the corner posts and other framing.

Wall Framing: Rear and Front Integration

Completing Opposite Side Wall Attachments

Repeating the side wall attachment process for the opposite side of the greenhouse.

Installing Doorway Framing and Rear Wall

Steps for installing vertical posts for doorway framing and the rear center wall panel (Part G).

Top Framing: Side Wall Supports

Installing Front Vertical Posts

Attaching the vertical posts from the front doorway framing set (Part I).

Attaching Side Top Supports

Steps for positioning and attaching the side top supports (Part S) with bevel edges to the wall posts.

Top Framing: Front Wall Caps

Completing Side Wall Top Caps

Repeating the attachment of side wall top caps to complete the upper wall structure.

Installing Front Wall Top Caps

Positioning and securing the front wall top caps (Part J) to the corner and doorway posts.

Top Framing: Side Wall Caps Installation

Attaching Left Side Front Wall Cap

Repeating the top cap installation for the left side of the front wall.

Installing Side Wall Top Caps

Positioning and attaching the side wall top caps (Part T) along the upper edge of the side walls.

Wall Window Installation: Initial Panels

Installing Rear Wall Top Caps

Attaching the rear wall top caps (Part H) to complete the upper rear structure.

Fitting Outside Angle Cut Polygal Windows

Instructions for installing the first set of polygal windows (Part K) into corner post dado cuts.

Wall Window Installation: Side and Rear

Sliding Windows into Top Caps

Ensuring windows are correctly seated in the top cap dado cuts and doorway posts.

Installing Rear Center and Side Windows

Fitting the rear center polygal window (Part L) and side polygal windows (Part W).

Wall Framing: Doorway Integration

Positioning Corner Polygal Windows

Fitting the remaining corner polygal windows, including side and front angle cut types.

Attaching Horizontal Doorway Top Caps

Securing the horizontal top cap (Part I) to the doorway framing to complete the structure.

Roof Framing: Initial Components

Installing King Studs and Gable Supports

Attaching king studs (Part O) and gable support frames (Part Q) to the top framing.

Positioning First Roof Rafters

Steps for lifting and positioning the first set of roof rafters (Part N) onto the structure.

Roof Framing: Rafters and Triangular Windows

Securing Roof Rafters to Structure

Attaching roof rafters to corner posts and angle cut windows using lag screws.

Installing Top Triangular Polygal Windows

Fitting the triangular polygal windows (Part M) into the top cap and rafter dado cuts.

Roof Framing: Completing Rafter Assembly

Sliding Rafters into Final Position

Ensuring rafters are flush with posts and windows remain seated in dado cuts.

Attaching Gable Support Frames to Rafters

Securing the gable support frames to the rafters using screws.

Roof Framing: Ridge Boards and Supports

Attaching Exterior Rafter Supports

Installing exterior rafter/doorway supports (Part OO) underneath the outside rafters.

Connecting Roof Ridge Boards

Fastening the two roof ridge board pieces (Part P) together using their dado cuts.

Roof Framing: Ridge Board Installation

Orientating the Ridge Board Correctly

Properly orientating the ridge board (Part P) with the off-center dado cut facing upwards.

Fitting and Securing the Ridge Board

Fitting the ridge board into the king stud notch and aligning dado cuts for secure attachment.

Roof Framing: Additional Rafters

Installing Roof Rafters with Spacer

Using template spacers to align and attach additional roof rafters (Part U) to the structure.

Securing Rafters to Ridge Board and Supports

Attaching new roof rafters to the ridge board and side top plate supports.

Roof Framing: Vent Supports

Installing Remaining Roof Rafters

Completing the installation of all roof rafters as illustrated.

Confirming Vent Framing Support Placement

Using vent framing supports (Part V) to verify rafter alignment and adjust as needed.

Roof Window: Hinged Vent Installation

Positioning the Hinged Vent Window

Placing the vent hinged window (Part Z) onto the ridge board for installation.

Attaching Vent Hinged Window to Ridge Board

Securing the hinged window to the ridge board with screws, ensuring free movement.

Roof Window Installation: Polygal Panels

Fitting Roof Polygal Windows

Sliding roof polygal windows (Part X) into the dado cuts of rafters and ridge board.

Securing and Sealing Roof Windows

Attaching windows with finishing nails and caulking seams for weather protection.

Roof Finishing: Top Ridge Caps

Attaching Top Ridge Caps

Positioning and attaching the top ridge caps (Part KK) to the ridge board for weather protection.

Installing Remaining Roof Windows

Completing the installation of all remaining roof polygal windows as per previous steps.

Ventilation System: Heat Activated Hinge

Attaching Vent Framing Supports

Positioning and attaching the inside vent framing supports (Part V) parallel to the hinged window.

Installing Heat Activated Hinge Assembly

Detailed steps for attaching the heat activated hinge assembly to the window and framing support.

Doorway Trim and Small Roof Windows

Installing Small Roof Polygal Windows

Fitting small roof windows (Part Y) into the rafter gaps and attaching them.

Attaching Door Filler Trim

Positioning and securing the vertical and horizontal door filler trim (Parts CC, CCC) to the doorway.

Door Assembly: Trim and Bottom Door

Installing Horizontal and Vertical Door Trim

Securing door trim (DD, EE) over the filler trim and onto the wall structure.

Attaching Bottom Dutch Door

Mounting hinges to the bottom dutch door (Part AA) and attaching it to the door trim.

Door Assembly: Top Door and Hardware

Attaching Top Dutch Door

Mounting hinges to the top dutch door (Part BB) and attaching it to the door trim, ensuring correct gap.

Installing Door Handle and Barrel Bolts

Attaching the exterior handle and barrel bolts, and the interior silver barrel bolt for door security.

Exterior Trim: Post and Wall Trims

Attaching Outside Post Trims

Positioning and securing the narrow and wide outside post trims (Parts FF and GG) to the corner posts.

Installing Vertical Wall Trim

Securing the vertical wall trim (Part HH) underneath the top wall caps along the walls.

Exterior Trim and Soffits

Attaching Corner Post Trim

Positioning and attaching the corner post trim (Part II) around each outside corner post.

Installing Side Soffits

Fitting and attaching the side soffits (Part LL) underneath roof windows and between posts.

Interior Features: Shelving and Caps

Attaching Detail Caps

Positioning and attaching detail caps (Part JJ) to cover post and rafter connections.

Installing Potting Shelves and Supports

Mounting potting shelves (Part MM) and their supports (Part NN) to the greenhouse walls.

Final Assembly and Product Care

Completing Shelving and Supports

Finalizing the installation of all interior shelving and supports.

Greenhouse Wood Care and Company Information

Notes on cedar wood care, product feedback, and contact information for the manufacturer.

Related product manuals