OLT 8x8 Cedar - Wall Framing: Completing Side Walls; Attaching Additional Side Vertical Posts; Positioning Side Wall Panels

Default Icon
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 8
7. Complete remaining
Corner Post/Wall attachments
following Steps 4-6.
8. To complete remaining Post and Side Wall
attachments, locate 3 Side Vertical Posts (Part R)
and 4 - 20 1/4” Wide Side Walls (Part E or F’s).
On solid, level ground such as a patio or deck lay
the pieces down as shown below. You will need
at least a 10’x10’ area. Place Side Vertical Posts
with their 2x3’s face down. (Vertical Posts are
made using a combination of 2x3’s/2x4’s). Place
Walls with Siding down as well.
Part R - Side Vertical Posts
Part E or F - 20 1/4” Wide Side Walls
2x4 facing up
2x3 facing down.
Top