EasyManua.ls Logo

OLT 8x8 Cedar - Foundation Construction: Layout and Base; Laying Out 4 x4 Foundation Framing; Installing Landscape Clothe and Gravel

Default Icon
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 6
2. Locate 4x4 Foundation
Framings. 2 front / 2 rear - 44.5”
long & 4 sides - 47 3/4” long. Lay
on sand base. Position and level
using straight 2x4 and level. Make
a footprint so outside dimensions
are approximately 96” wide x 96”
long. Screw ends of 4x4 together
with 2- 3” screws per end.
Optional- Secure 4x4’s to ground
with Tie Down Kit or Rebar. See
D. on Foundation Page.
44 1/2”
47 3/4”
96”
95 1/2”
3” screws
3. Position and cut Landscape Clothe to fit inside
4x4 Foundation Framing. Lay approximately 3-4” of
Small Gravel and pack down.
Landscape Clothe
Small Gravel
You can find the
Square Drive Bit
for the screws in
with the Hardware
Kit Bag.
95 1/2”
Completed Foundation

Related product manuals