15. From the inside, slide a
Flange Nut over bolt and tighten.
Important:
Only snug Carriage Bolts at this
stage. After Handrail and Upper
Baluster Section are installed,
come back and firmly tighten all
Carriage Bolts with a wrench.
13. When holes are
aligned, slide 4 - Carriage
Bolts from the outside
through Post and “T” Post
Mount Plates.
14. Complete all four “T” Post
Mount and Post Carriage Bolt
attachments.
Important:
Once again, only snug Carriage Bolts
at this stage. After Handrail and Upper
Baluster Section are installed, come
back and firmly tighten with wrench.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 8
Flange Nut