EasyManua.ls Logo

OLT Bayside - Page 8

Default Icon
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15. From the inside, slide a
Flange Nut over bolt and tighten.
Important:
Only snug Carriage Bolts at this
stage. After Handrail and Upper
Baluster Section are installed,
come back and firmly tighten all
Carriage Bolts with a wrench.
13. When holes are
aligned, slide 4 - Carriage
Bolts from the outside
through Post and “T” Post
Mount Plates.
14. Complete all four “T” Post
Mount and Post Carriage Bolt
attachments.
Important:
Once again, only snug Carriage Bolts
at this stage. After Handrail and Upper
Baluster Section are installed, come
back and firmly tighten with wrench.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 8
Flange Nut

Related product manuals