EasyManua.ls Logo

Omega VSHP SERIES - Page 26

Omega VSHP SERIES
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OMEGA | OMEGA-VSHP.F-PGD-1904
24 www.omega-heatpump.com
Figure 22 Perimeter Panel Furring Drawing
Right Riser Location
(Left is Mirror)
Back Riser Location
Notes:
The framing should be installed for a maximum 0.5” maximum clearance between the heat pump return air flange and the return air
panel throat opening flange.
Return air panel should be centered in front of the unit return air opening.
For rear/side risers, allow an additional 5” clearance at the back/side of the units.
Insulate the drywall enclosure with plenum rated acoustical insulation.
5.6 Perimeter Front Return Air Panel & Furring Details (Cont’d)
Figure 23 Perimeter Panel Cabinet Base Height Calculation
Perimeter Panel Cabinet Base Height Calculation
C = Cabinet Base Height - .875”
B = Baseboard + Finish Floor Height*
G = Baseboard Gap (min 0.5”)
B = Cabinet Base Size
(Min 5", increases in 1" increments)
B = B + G + 0.875”
Note: *Include flooring thickness, underlayment, and any
concrete leveling as part of calculation.
Example:
If using a 5" baseboard, with 1” Flooring height, and 0.5" gap
B = (5” + 1”) + (0.5) + 0.875” = 7.375"
Hence an 8" Cabinet Base is required

Other manuals for Omega VSHP SERIES

Related product manuals