EasyManua.ls Logo

Optimum BF20L - Page 34

Optimum BF20L
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembly and maintenance instruction recirculating ball
OPTIMUM
MASCHINEN - GERMANY
5. Dezember 2007Page 34 Recirculating ball screw assembly and maintenance instruction ; Version 2.0
© 2007
GB
£ Disassembly of the support (part 2)
from the support (part 1) of the Z-
axis.
£ Slide the support (part 2) as
illustrated onto the spindle of the Z-
axis.
£ Before fastening the hexagon
socket screws apply a securing
mean.
£ Slide the expansion bellows on the
guideway of the Z-axis.
Fig.1-60: Assembly recirculating ball screw
Z-axis
Support (part 1)
Z-axis
Support (part 2)
Z-axis
Pillow block Z-axis
Recirculating ball
screw Z-axis
Support (part 2)
Z-axis
Securing mean
Recirculating ball
screw Z-axis
Hexagon socket
screw
Expansion bellows