EasyManua.ls Logo

Optimum OPTigrind GU 15B User Manual

Optimum OPTigrind GU 15B
62 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
OPTIMUM
MASCHINEN - GERMANY
®
Schleifmaschine
Grinding machine
Betriebsanleitung - DE
Operating manual - EN
Version 1.0.2
Artikel Nr. Item no. 3101600
Artikel Nr. Item no. 3101605
3101615
Artikel Nr. Item no. 3101610
Artikel Nr. Item no. 3101620

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Optimum OPTigrind GU 15B and is the answer not in the manual?

Optimum OPTigrind GU 15B Specifications

General IconGeneral
Voltage230 V
Grinding wheel dimensions150 x 20 x 12.7 mm
Bore diameter12.7 mm
Motor Power1500 W
Grinding wheel speed2850 RPM

Summary

Machine Safety

Safety Warnings and Notes

Details safety warnings and their classifications, including danger levels.

Hazard Classification System

Classifies safety warnings into categories like DANGER, WARNING, CAUTION, INFORMATION.

Machine Intended Use

Defines the specific and authorized uses of the grinding machine.

Foreseeable Misuse Scenarios

Describes uses that are considered misuse and are not permissible.

Preventing Machine Misuse

Provides guidance and measures to prevent improper use of the machine.

Grinding Machine Hazards

Lists potential hazards and risks associated with the operation of the grinding machine.

Operator and Personnel Qualification

Outlines the necessary qualifications and training for personnel operating the machine.

Operational Safety Measures

Details essential safety precautions to be followed while the machine is in operation.

Machine Safety Devices

Describes the built-in safety features and their importance for safe operation.

Required Personal Protective Equipment (PPE)

Lists required personal protective equipment (PPE) for safe operation.

User Safety During Operation

Provides critical safety advice for the user during machine operation.

Disconnecting and Securing the Machine

Instructions on how to safely disconnect and secure the machine.

Unpacking and Connecting the Machine

Initial Machine Commissioning

Details the initial steps and procedures for putting the machine into operation.

Commissioning Procedures

Further instructions for the initial commissioning process.

Power Supply Connection

Guidance on connecting the electrical power supply to the machine.

Machine Operation Guidelines

Instructions and precautions for the normal operation of the grinding machine.

Machine Maintenance

Maintenance Safety Precautions

Safety precautions to be observed during maintenance activities.

Maintenance Preparation Steps

Steps to take before starting any maintenance work on the machine.

GU1 Extraction Unit Operation

Extraction Unit Intended Use

Defines the correct and authorized uses for the extraction unit GU1.

Extraction Unit Misuse Scenarios

Describes improper uses of the extraction unit that are not permitted.

Extraction Unit Commissioning

Instructions for the initial setup and commissioning of the extraction unit.

Extraction Unit Operation Guide

Guidance on the proper operation of the extraction unit.

Fire and Explosion Prevention

Related product manuals