EasyManua.ls Logo

Opus OP4 - Page 27

Opus OP4
51 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
opuscamper.com.au
26
INSTALLING YOUR
Air OPUS® ANNEXE
STEP 8
After main pump shuts off it has reached the desired pressure. Remember to turn the
MAIN GREEN INFLATION switch in the camper to the horizontal CLOSED position when
ation is complete. Close all internal valves on annexe and tent, including the cross
tube. Remember to open for De ation.
STEP 9
Go around the annexe to peg walls and guy ropes and
x.
STEP 10
Attach velcro seals between canopy and annexe.
to canopy continued...
OP 4 USER MANUAL | version 2.0

Related product manuals