LIB
cgmcosmos
Medium voltage cubicles with full insulation
in SF
6
gas up to 24 kV for Belgium
Synergrid AA10
General instructions
IG-296-EN, version 01, 12/03/2020

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Ormazabal cgmcosmos-v and is the answer not in the manual?

Ormazabal cgmcosmos-v Specifications

General IconGeneral
BrandOrmazabal
Modelcgmcosmos-v
CategoryControl Systems
LanguageEnglish

Summary

General Description

Product Models

Lists unifunctional and multifunctional switchgear models.

Applicable Standards

Lists IEC standards applicable to the equipment.

Key Components Overview

Details the primary parts of the cgmcosmos cubicles.

Electrical Specifications

Provides technical electrical data for the cubicles.

Dimensions and Weights

Lists physical dimensions and weight for different models.

Operating Environmental Conditions

Specifies environmental conditions for installation and operation.

Handling and Transport

Safe Lifting and Handling Procedures

Explains methods for safely lifting and moving the cubicles.

Storage

Recommended Storage Guidelines

Outlines recommended conditions for storing the equipment.

Installation

Equipment Unpacking Procedure

Step-by-step guide for removing the cubicle from its packaging.

Accessory Location During Transport

Shows where accessories are stored during shipping.

Installation Clearances

Specifies required clearances around the cubicle.

Cable Connection Trenches

Details dimensions for cable trenches for different cubicle types.

Floor Anchoring and Fastening

Covers methods for securing cubicles to the floor.

Cubicle Interconnection

Instructions for joining multiple cubicles together.

Switchgear Earthing Connection

Procedures for safely grounding the equipment.

Medium Voltage Cable Connections

Details on connecting MV cables to cubicle bushings.

Horizontal Front Cable Connection

Steps for making horizontal cable connections at the front.

Vertical Front Cable Connection

Steps for making vertical cable connections at the front.

Recommended Sequence of Operations

SF6 Gas Pressure Check

Procedure to verify SF6 gas pressure before operations.

Feeder Function Operations

Mimic diagram, levers, and operational steps for feeder units.

Fuse Protection Function Operations

Mimic diagram, levers, and operational steps for fuse protection.

Fuse Replacement Procedure

Step-by-step guide for replacing blown fuses.

Circuit-Breaker Operations

Mimic diagram, levers, and operational steps for circuit-breaker units.

Safety Elements

Safety Interlock Mechanisms

Explains safety interlocks and locking mechanisms.

Maintenance

Preventive Maintenance Schedule

Guidelines for routine preventive maintenance tasks.

Spares and Accessories

Replacement Parts and Accessories

Details on available spare parts and optional accessories.

Environmental Information

Environmental Information and SF6 Management

Details on SF6 gas, its environmental impact, and disposal.