EasyManua.ls Logo

PALAZZANI RAGNO XTJ 32 / C - 3.22 Check-Up (From Ground Panels)

Default Icon
210 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Palazzani
Palazzani Industrie spa
OM 386 pag 29 Cap 3
3.22 CHECK-UP (FROM GROUND PANELS)
Especially after a period of inactivity, platform needs a check-up before working :
Check up list:
when you turn the starting key of diesel engine, legs' flashing lights must be
on (Fig. 3.13)
these lights must be off when legs are lowered in pressure on the ground
the green light on the turntable is on (Fig. 3.17)
lift the boom until this green light on the turntable is switched off, descent
until it switch on again, rotate the turntable slightly until the green light
switches off.
Hoist the boom till the green lamp of rest position is off and try to raise the
legs (it must be impossible !!) If the stabilisers move do not use the machine
and bring it to an authorised workshop or to the manufacturer)
open the jib slightly and extend the boom until it stops when the red light on
the manoeuvre panel and on one of the two stabilisers from the opposite
boom position side (Fig. 3.13) switches on
try now to lift the boom slightly and than lower it (if the red light is still on
this manouvre must be possible)
check that the red light on the manoeuvre panel remains on together with the
green light near it
check the correct working of : emergency stop push-buttons