OM 386 pag 32 Cap 3
control first movements at a slow speed and let engine run, in order to
have hydraulic oil at a right temperature
leave the engine turning for the first 15 min even if the aerial work does not
requires it
till hydraulic oil has not reached a right temperature, irregular speed
movements are possible
Driving on a slope
In case of slope grounds, first select the slow speed “snail” and observe the
following:
keep the booms extremities towards the slope
when driving on a slope, it is recommended to pre-select slow speed and
cage side of the platform must be always up-hill positioned
when driving on irregular ground it is recommended to lower stabilizing
legs near the ground (30 cms. approx.)
it is also recommended to take the boom as low as possible
platform must be driven from a safe side position (not before or behind)
Lights
For night working or in few lighted sites, use the electric socket on the cage to light
a lamp max 60W a 220v c.a.
Lifted by crane
For loading the platform on a truck, it is possible to use a crane.
In this case:
be sure that the stabilisers are completely retracted
use the fixing rings onthe stabilisers to attach the machine to the crane with
four independent ropes
Use lifting equipment, i.e. ropes, with proper sections for lifting and check
that the crane loading is proper with the total platform weight indicated in the
turntable.