① Lead the Flexible Cord connected to ELB terminal
inside the Unit: 2.5 mm², 3 core Flexible Cord.
② Unscrew the Cord Holder and fix the Flexible Cord. Strip
the lead wire (coating). Fasten the live wire (L) and neutral
wire (N) to the ELB (L,N) and earth wire to the Ground Point
with 1 N•m (10 kgf.cm) torque. Fix back the Cord Holder to
its position to clamp the Flexible Cord.
③ Connect wires in correct polarity
(L,N).
• Connect the wires in wrong polarity (L,N) causes an abnormal condition which may lead to
electric leaking, burning, etc.
• Before wiring, please check polarity (L,N) with voltage range of a tester or voltmeter by
connecting one terminal of the meter to earth while the other to one of the Power Supply terminals.
• When the needle of the meter deflects greatly, the polarity of the Power Supply terminal is ‘L’.
Main Power Board
Earth
Tester
Power-Supply
Terminals
Earth
ON/OFF DP
(double pole) Switch
Miniature Circuit
Breaker (MCB)
Flexible Cord 2.5 mm², 3 core
WARNING
MUST BE
TIGHTENED
L N
Bath Room
ELB Terminal
WARNING
MUST BE
TIGHTENED
L N
1 N•m
Ground
Point
L
N
Flexible
Cord
60 mm
140 mm
13 mm
13 mm
L
N
Flexible
Cord
60 mm
70 mm
13 mm
13 mm
WARNING
MUST BE
TIGHTENED
L N
L N
Terminal ELB
Cord
Holder
DH-3NS1 / DH-3NS2:
DH-3NP2:
5 mm
3. How to fix Electric Home Shower.
① The distance of the Unit should be more
than 250 mm at right and left of the wall.
② Make 4 holes at the wall by means of a drill
(refer Figure 1).
③ Drive a Wall Plug into the hole.
Figure 1
25 mm
Ø6 mm
②
Wall Plug
③
①
Wall Wall
250 mm
minimum
250 mm
minimum
Screw
Screw
145 mm
72.5 mm
200 mm
6.5 mm
317 mm
46.5 mm
⑤ • Mount the Unit on the wall with 4
screws.
• Drive each Screw into the two
upper Wall Plugs through the
screw holes on the Back Plate.
• After tighten up the two upper
Screws, tighten up the remaining
two Screws.
⑥ Please ensure the Unit fixed tightly
on wall by shaking it left and right.
Note: The Back Plate must be
mounted with 4 Screws.
Wall Plug
Screw
Wall
Back
Plate
⑤
Flexible Cord Entry Point
④ Lead the Flexible Cord to the set thru Portion 1 or 2 as shown below for electric wiring process.
Portion 1:
Portion 2:
Flexible Cord must enter the Unit thru designated point only
(do not make additional holes).
CAUTION
Wall Plug
Wall
Back
Plate
⑥
4. Electric wiring
Proper size of Flexible Cord and electric wiring must be installed to avoid
smoke emission and fire hazards.
The Home Shower must be permanently connected to the electric supply
through the ON/OFF DP (double pole) Switch having a contact separation
of at least 3 mm in all poles incorporated in the fixed wiring. This switch
must be clearly identifiable but out of reach of a person using a fixed bath
or shower.
WARNING
WARNING
- 26 -