EN18
English
TEST OPERATION
1. • Before switch ON electricity supply, please check the electrical wiring connection to the
Unit.
• Switch ON the Miniature Circuit Breaker (MCB) and ON/OFF DP (double pole) Switch.
• Set the ELB of the Unit to On. (Push up the ELB Reset Lever if it is down. For Vietnam
models only, ELB light is on if the set is on).
• Push the ELB Test Button.
• It is normal if the ELB turns Off (the ELB Reset Lever falls) and push the ELB Reset Lever
up. Refer fi gure as shown.
• Inspection on the built-in ELB (once a month) to avoid a hazard to users such as damage to
property, serious injury or death.
WARNING
If the ELB Reset Lever cannot be reset even if you push it up or if it soon slides
down during operation, please do not use the Unit and contact the authorized
dealer immediately to avoid a hazard to users such as damage to property,
serious injury or death. Never fi x the ELB Reset Lever forcibly with tape, etc.
MAX
ELB
Test Button
Push
ELB
Reset Lever
2. • Turn On the Main Water Valve.
• Turn the Water Volume Knob anticlockwise and water will fl ow out from the Shower Head.
• Check if water leaks from the Pipe Line.
3. • For other destination models, turn the Power Knob to On (ELB indicator LED will light on).
• Turn the Power Knob clockwise and hot water will fl ow out from the Shower Head.
(Adjust to desire water temperature).
4. • Refer detail for HOW TO USE and WATER FLOW RATE ADJUSTMENT on page EN7 and EN8.