Solive
Joist
Solive
Joist
Bottom ange
Bride inférieure
4 Long screws
(M4.2X30)
4vis longues
(M4.2X30)
1. Insert two suspension brackets.
2. Install the suspension bracket and x the
adaptor frame by using long screws.
During installation the distance C
should be kept the same as the
drywall thickness.
Note
Lors de l’installation, la distance C doit être
identique à l’épaisseur de la cloison sèche.
Nota
1. Open one knock-out hole on junction
box and connect wires.
(Refer to wiring diagram on page 4.)
2. Install insulated ducts to the OA and
EA adapter.
C
Scale
Échelle
There is the scale on the frame to adjust the C distance
which is the same as drywall thickness
L’échelle sur le cadre sert à ajuster la distance C qui est
la même que celle de l’épaisseur de la cloison sèche.
Suspension bracket
supports de suspension
13 1/2~16 (343~405)
4 Long screws
(M4.2X30)
4vis longues
(M4.2X30)
1. Insérez deux supports de suspension.
2. Installez le support de suspension et xez le
cadre adaptateur à l’aide des vis longues.
1. Ouvrez un trou à défoncer sur la boîte de
jonction et connectez les ls.
(Consultez le schéma de connexions à la page4.)
2. Installez les conduits isolés sur les adaptateurs
AA et EA.
20
10
1
2
inch/mm
20
10
1
2
inch/mm
Solive
Joist
Conduit isolé
Insulated duct
Isolation de l’adaptateur
Adaptor insulation from
Ruban
Tape
INSTALLATION
Ⅰ
(CEILING MOUNT) / INSTALLATION
Ⅰ
(MONTAGE AU PLAFOND)
6
Conduit isolé
Insulated duct
Ruban
Tape
Adaptateur
Adaptor
Conduit de 4po
For 4” duct /
Conduit isolé
Insulated duct
Ruban
Tape
Adaptateur
Adaptor
Conduit de 5po
For 5” duct /
EN FR
EN FR
Unit: inches (mm)
Unités: po (mm)