EasyManua.ls Logo

Panasonic NR-B32SG2 - Page 62

Panasonic NR-B32SG2
97 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
62
6. Insert the capillary tube at least 1 cm inside the new dryer
and weld the connection.
Note: Dryer must be changed in every time before
gas charging.
7. Curl the capillary tube as in the below picture. Weld the
main tube and new service tube to dryer.
8. Change the service pipe of compressor with new one.

Table of Contents

Other manuals for Panasonic NR-B32SG2

Related product manuals