EasyManua.ls Logo

Panasonic PV-L550 - Page 21

Panasonic PV-L550
203 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.1.6. METHOD FOR
LOADING/UNLOADING OF
MECHANISM
5.1.6.1. (Electrical Method)
CAUTION:
If loading does not start after DC Power Supply is applied,
DO NOT continue to applying DC Power Supply.
Connect the TP Board Kit as shown, and apply 3VDC Power
Supply (DC+ to TP21, DC- to TP20 for loading or DC+ to TP20,
DC- to TP21 for unloading). Refer to "HOW TO USE TP
BOARD KIT."
It normally takes approx. 6 seconds to unload the Mechanism
from fully-loaded position to EJECT position.
Fig. 3-1
5.1.6.2. (Manual Method) without Cabinet
Parts
Turn the Gear of Reduction Gear Unit clockwise (for loading) or
counterclockwise (for unloading) manually.
It is necessary to rotate approx. 80 times from fully-loaded
position to EJECT position.
Fig. 3-2
19
PV-D300 / VM-D100 / PV-L550 / PV-L600 / PV-L650 / VM-L450

Table of Contents

Related product manuals