EasyManua.ls Logo

Paratec Next - Page 16

Paratec Next
49 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Paratec GmbH
Next H / C
Issue II
04-2005
Owner‘s Manual
16
The above two pictures show from different perspectives, how the
main deployment bag is set into the main tray vertically to begin with.
Make sure that the main risers are stowed alongside the reserve con-
tainer, showing no excess length and the bag filling out the corners.