EasyManua.ls Logo

Party Tents Direct Weekender West Coast Frame User Manual

Default Icon
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Assembly
Instructions
WEEKENDER–
WEST COAST
FRAME TENTS
10´x10´ / 20´x30´
10´x 20´ / 20´x40´
20´x20´ /
888 291-4615 (toll free)
Question and Answer IconNeed help?

Do you have a question about the Party Tents Direct Weekender West Coast Frame and is the answer not in the manual?

Party Tents Direct Weekender West Coast Frame Specifications

General IconGeneral
BrandParty Tents Direct
ModelWeekender West Coast Frame
CategoryTent
LanguageEnglish

Summary

Assembly Instructions

Weekender-West Coast Frame Tent Overview

Tent Design and Features

Explains benefits of West Coast design, fewer parts, and faster setup.

Step 1: Check Item List - 10x10 & 10x20

10 x 10 Weekender Parts

Lists all components and quantities for the 10x10 tent model.

10 x 20 Weekender Parts

Lists all components and quantities for the 10x20 tent model.

Step 1: Check Item List - 20x20 & 20x30

20 x 20 Weekender Parts

Lists all components and quantities for the 20x20 tent model.

20 x 30 Weekender Parts

Lists all components and quantities for the 20x30 tent model.

Step 1: Check Item List - 20x40

20 x 40 Weekender Parts

Lists all components and quantities for the 20x40 tent model.

Step 2: Safety Check List

General Safety Precautions

Outlines safety rules like wearing hard hats, steel-toe boots, and site inspection.

Before You Dig Guidelines

Advises on contacting utility companies before digging to locate underground lines.

Step 3: Layout Frame

Frame Layout Positioning

Details how to position poles and fittings for the finished tent layout.

Step 4: Ridge and Perimeter

Connecting Ridge and Perimeter Bars

Instructions for connecting ridge lines, crowns, spreaders, and perimeter bars.

Step 5: Completed Frame

Frame Final Checks and Adjustments

Guides on double-checking connections and lifting the frame into position.

Step 6: Ratchet Straps

Securing Frame with Ratchet Straps

Explains how to tie anchor ropes and secure ratchet straps to tent stakes.

Step 7: Canopy

Canopy Placement and Initial Lift

Covers laying out a tarp, placing ladders, and pulling the canopy over the frame.

Step 8: Canopy Connections

Attaching Canopy to Frame

Details using bungee balls or spring buckle straps to secure the canopy.

Step 9: Base Plates

Base Plate and Leg Pole Preparation

Instructions for preparing leg poles and connecting base plates using eye-screws.

Step 10: Installing Legs - Smaller Tents

Installing Legs on Smaller Tents

Steps for raising the frame and installing leg poles on 10x10, 10x20, 20x20 tents.

Step 10: Installing Legs - Larger Tents

Installing Legs on Larger Tents

Procedures for using frame tent jacks on 20x20 and larger tents.

Step 11: Stake Line

Staking Tent for Stability

Details measuring distances and hammering stakes for proper tent anchoring.

Step 12: Securing Ropes

Final Ratchet Strap and Rope Tightening

Guides on tightening all ratchet straps and securing remaining connectors.

Strike Procedure

Tent Disassembly Process

Outlines the reverse steps for taking down the tent, including folding and bagging.