Step 2.
Finish assembling the supporting frame by:
a) Connecting 7 x leg poles (#1) with the poles of #4 and #5 on the top frame accordingly
and lift the structure from the other side (SEVERAL ADULTS REQUIRED!)
b) Connecting the poles (#1) with (#7) by using the 4 x L-Shaped Foot Bases (#C) and the
10 x T-Shaped Foot Bases (#D). You'll use 4 x M8X50 Screws (#J) to tighten 4 x leg
poles(#1) with the L-Shaped Foot Bases (#C) and 10 x M8X50 Screws (#J) to tighten
10 x leg poles(#1) with the T-Shape 2 Corner Foot Bases (#D).
c) Fix the structure to the ground by inserting the L-Shaped Pegs (#K) into the hole of foot
bases and locking pole #7 with U- Shaped Pegs (#L).
φ5*55*250mm
M8*50
M8*50