1:First, remove the protective corners from the power packs you
want to stack, and align them with the positioning structure,
placing them on top of each other.
STACKING AND SECURING MULTIPLE POWER PACKS
EP3000-48V 3072Wh
25%
50% 75% 100%
EP3000-48V 3072Wh
25%
50% 75% 100%
Corresponding to
bottom projection
2:Use screws and metal connecting piece to secure the stacked
power packs from top to bottom.
3:Install the protective corners in the following order: align the
side with the positioning structure first, then snap the front
side into place. Install them one by one until they are properly
positioned.