EasyManua.ls Logo

Penguin FLORENCE - Page 44

Default Icon
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44
STEP #1
D-3
"Top View"
B-3
A-3 1/2
E-3
E-3
E-3
E-3
E-3
E-3
1.1 Decide the position of the door frames before assembly according to where you intend to
slide the door. At the front of the solarium, use frame (D-3) for the opening of the door and Frame
Next to Door B-3 for the direction of the door when open.
1.2 Align the Sliding Door Frame (D-3) with the Frame Next To Door (B-3), use the Connecting
Piece (E-3) to insert the Sliding Door Frame (D-3) and the inside of the Frame Next to Door (B-3),
connect the outside in the same way. Then align the Door (B-3) with the Frame Next To Door
(A-3 1/2), use the Connecting Piece (E-3) to insert the Frame Next to Door (B-3) and the inside of
the door (A-3 1/2), connect the outside in the same way.
NOTE:
When sliding the Connectors (E-3), shake the frame so that they will slide easily. Do not use tools
to force. If needed, clean the paint with a file and make sure the ends of the frame and joints are
not bent or warped. If so, use the needle-nosed pliers to straighten.
E-3

Related product manuals