EasyManua.ls Logo

PlayGoPools 2200 - Step 1: Pre-assembling Corner Sections

Default Icon
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
Step 1
Screw twelve 1” self-tapping screws through two Top Ledges and two Bottom Channels into one
Corner Post and two Wall Panels to build a Corner Section as pictured below.
Note: Screws for the Top Ledges should be located only on the outer/dry side of the pool. Before
screwing for easier screwing, please pre-drill all the necessary openings by using a 1/8” drill bit through
the factory pre-drilled ¼” openings.
• Use the pre-drilled holes located on the Top Ledges and Bottom Channels as your guide.
IMPORTANT: When placing two Top Ledges over the Wall Panels at the corner, please make
sure that you put them a little bit farther from the Corner by all means, making a very small gap
between the Corner and Top Ledges and providing the place for locating the Corner Cap later
(please see two pictures below).
Pre-assembling Corner Sections: