25
Inserting a Rebar into the In-Ground Buttress:
For In-Ground Installation more than 24” In-Ground:
Ground Preparation:
• First, dig a hole 52” deep and 36” wider than your pool size.
• Next, follow the instruction of the Above Ground & Semi-In Ground Pool installation.
Drill out two holes near the Reinforcing Bracket (about 0.7” from the Reinforcing Bracket towards
the dry/outer end of each Horizontal Buttress) at about 10-degree angle from the vertical line. Next,
drive 18” of rebar (not included) through the drilled out holes leaving 7” remaining visible as
illustrated below.
IMPORTANT: Before starting the Installation Process, PLEASE read the entire Instruction
carefully and comprehensively step-by-step to follow all the information mentioned. Otherwise,
if you do not follow the Instruction out completely, the Pool Warranty attached to the Instruction
will become void.