24
For Semi-In Ground Installation up to 24” In Ground:
• First, follow the instruction of the Above Ground Pool installation.
• en, if extra supports are required for patio or other pool features, consider installing them before
backlling the crushed stone or gravel.
• Next, drill out two holes through the ends of each horizontal buttress (5” from the ends on the dry
side). Next, drive 18” of rebar (not included) through the drilled out holes leaving 7” remaining visible
as illustrated below.
• Next, apply tar paper as a protective shield/barrier to the pool wall that will be underground and
covered by crushed stone or gravel.
• Next, add crushed stone or gravel between the space of the pool’s wall and ground dirt.
• Next, back ll as the pool is being lled with water, making sure that the gravel is fully settled and
lightly compacted as it is added.
IMPORTANT: Before starting the Installation Process, PLEASE read the entire Instruction
carefully and comprehensively step-by-step to follow all the information mentioned. Otherwise,
if you do not follow the Instruction out completely, the Pool Warranty attached to the Instruction
will become void.