EasyManua.ls Logo

Pool Warehouse SUNRAY - Section 4: Installing Top Rails & Verticals; Attach Uprights and Top Ledges

Pool Warehouse SUNRAY
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
No Diving or Jumping. Observe all Safety Rules.
4-1
A. Attach your Uprights and
Top Ledges (SUNRAY)
1. ContinuellingyourPool
a. Continuellingyourpoolwithwater.Donotputinmorethan12"(30cm)of
wateruntilthetoprailsandverticalcolumnsareallattached.
b. Keepworkingonthetoprailsandverticalcolumnswhilethepoollls.
• Seethedrawingonthenextpageforanoverviewofallthepartsusedto
installtheverticals,toprailsandtopconnectors.
2. InstalltheUprightsandLedges
a. Lineupthebottomofoneverticalcolumn(key1)with
thetabononebaseplate(key2).Thetabmustbeonthe
outsideoftheverticalcolumn.
b. Lineupthescrewholesandfastenwithoneself-tapping
screw(key3).
c. Placeatopconnector(key4)over
thetopedgeofthepoolwall(key
5)withthetabontheoutsideofthe
pool.Lineuptheholeinthetab
withthescrewholenearthetopof
theverticalcolumn.Thetabmustbe
on the outsideoftheverticalcol-
umn.Makesuretheverticalcolumn
isstraightupanddown.
d. Slideoneendofatoprail(key6)intothetopconnector.
e. Fastenthetopconnectortotheverticalcolumnwithoneself-tappingscrew(key
7).
f. Repeatthelastvestepsforeachoftheverticalcolumnsaroundthepoolwall.
Section
PoolComponentInstallationManual
InstallingtheTop
Rails&Verticals
Hint:
Use the ridges in the
poolwalltomakesure
theverticalcolumnis
straightupanddown.
1
4
1
3
2
2
4
6
5
7