ASSEMBLY and OPERATION of your TUBE RUNNER PRO
(1) Remove the top handle+cover assembly by holding the shaft (a) underneath the battery compartment tray
then rotating to the left halfway, then to the right halfway.
(2) Unscrew the plastic nut on the top of the handle assembly by turning counter-clockwise.
(3) After the Handle Cover is removed,
push in the two locking clips on either side
of the retaining screw to dislodge the
drive shaft from the battery housing.
(4) Remove the shaft from the battery
housing assembly.
BATTERY INSTALLATION & ASSEMBLY
HOLD HERE
1
2
a
3
4
4.