EasyManua.ls Logo

Poollock V5A - User Manual

Default Icon
5 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
SHORT INSTALLATION MANUAL
V5A
Safety covers since 1975
Question and Answer IconNeed help?

Do you have a question about the Poollock V5A and is the answer not in the manual?

Summary

Before Installation & Pocket Profile Setup

Initial Measurement and Verification

Verify pool dimensions and pit, ensuring they match the order specifications.

Track Length (TL) Calculation

Defines the calculation for Track Length (TL) based on pool dimensions.

Pocket Profile Length Specification

Specifies the required length for the pocket profile relative to TL.

Pocket Profile Installation Flush

Install the pocket profile ensuring it is flush with the inner pit wall.

Pocket Profile Parallelism

Pocket profile must be installed parallel, with a tolerance of 20mm.

Track Groove to Track Groove (TT) Alignment

Ensure the TT dimension (track groove to track groove) matches the ordered specification.

Pocket Profile and End Wall Installation

Install pocket profile and end wall insert first, then complete pool finishing.

Pocket Profile Cleanliness Check

Ensure the pocket profile is clean and free of debris before installation.

Tracks and Mechanism Installation

Guide and Guide-Bracket Mounting

Mount the guide on the track and attach the guide plate or bracket to the mechanism.

Under Track and Mechanism Positioning

Install the under track with guide and bracket, noting bracket's role in mechanism positioning.

Mechanism Securing and Depth

Fix the mechanism front, bottom, and back, ensuring correct depth of 430mm.

Mechanism Alignment and Leveling

Ensure the mechanism is installed level and in line with the tracks.

Lid Bracket and Roll-up Tube Installation

Lid Bracket Installation

Install Lid-brackets and Lid-bracket End-set before the roll-up tube.

Lid Bracket Spacing

Install lid brackets according to lid joints, distributing remainder along the pit back wall.

Roll-up Tube Installation

Fix the roll-up tube to shafts using rubber pads, washers, and screws.

Roll-up Tube Centering and Securing

Center the roll-up tube and secure it by tightening lock rings on both sides.

Cover and Leading Bar Installation

Cover Unfolding and Orientation

Unfold cover canvas behind pit with plastic gliders on top (correct side up).

Rope Management During Unwinding

Unwind ropes carefully from the reel, preventing twisting for optimal performance.

Rope Routing Through Tracks and Pulley

Pull the rope through tracks, around the pulley, and back to the pit.

Glider and Guide Securing

Insert glider through guide, fix top of guide, ensure all screws are tight.

Leading Bar Installation

Place cover into leading bar groove and fix leading bar to glider-bracket.

Manual Cover Pulling

Manually pull the cover onto the pool to complete the leading bar installation.

Power Pack, Hoses, and Canvas Attachment

Power Pack and Hose Installation

Install power pack, connect hoses, fill tank with specified oil, and run for 3 minutes.

Canvas Attachment to Roll-up Tube

Find centers of tube and cover, attach center of canvas, then the rest of the canvas.

Cover Rolling onto Tube

Roll the cover onto the roll-up tube after securing the canvas.

Rope and Lid Installation

Rope Installation to Pulleys and Equalizer

Pull ropes through pulleys and equalizer as per diagram.

Rope Connection to Rope Drum

Connect the ropes to the rope drum to finalize rope installation.

Final Lid Bracket and Lid Installation

Install lid brackets and the lid according to the specific components provided.

Poollock V5A Specifications

General IconGeneral
BrandPoollock
ModelV5A
CategoryLighting Equipment
LanguageEnglish