EasyManua.ls Logo

Posh Domaine User Manual

Posh Domaine
9 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
page 11 of 19
Plumbers, please ensure a copy of the installation
instructions is left with the end user for future reference
Domaine Ensuite Floor Mount
PRIOR TO INSTALLATION CHECKLIST
This product must be installed by a qualied tradesperson and we would expect the installation to
be undertaken in a tradesperson like manner and nished to a tradesperson standard. This product
carries a full warranty against faulty workmanship and materials.
Please inspect thoroughly before installation to ensure that the product has not been damaged
and is correct. No claims for damage or incorrect items will be recognised after installation.
Check Products For Any Damages
Positioning & Ventilation
Check for Support Beams
Within 48 hours of receiving your goods, unpack your ADP
product and check for any possible freight damages or incorrect
items.
Please contact your place of purchase to report damages or
missing parts.
No claims for damages will be recognised after installation.
Please note: xing screws/bolts are not supplied for installation.
Planning your bathroom furniture placement is critical.
Furniture must be at least 300mm away from any
wet areas. Materials used in the construction of our
furntiture units are moisture resistant, not water proof.
Do not expose furniture to shower spray.
It is important that your bathroom is adequatley
ventilated to eliminate moisture build up.
High humidity will lead to permanent dampness and
mould resulting in a deterioration of the materials in
your bathroom.
Wall hung furniture & basins require xing to a support
beam tted between the studs to give a solid wall backing
to attach the vanity to.
If necessary, x additional support noggins at desired
height for cabinet and basin xing prior to sheeting the wall.
Ensure total width of support noggin exceeds vanity width.
1
2
3
Ventilation is
important to
prevent mould
& moisture
build up
300mm
(minimum clearance)
BATH
IT IS THE RESPONSIBILITY OF THE INSTALLER TO MAKE ANY ADJUSTMENTS
TO DOORS/DRAWERS AFTER INSTALLATION IF REQUIRED.
page 1 of 9
Question and Answer IconNeed help?

Do you have a question about the Posh Domaine and is the answer not in the manual?

Posh Domaine Specifications

General IconGeneral
BrandPosh
ModelDomaine
CategoryIndoor Furnishing
LanguageEnglish

Summary

PRIOR TO INSTALLATION CHECKLIST

Check Products For Any Damages

Inspect for freight damage or incorrect items within 48 hours of receipt. Claims require pre-installation checks.

Positioning & Ventilation

Ensure 300mm clearance from wet areas and adequate bathroom ventilation to prevent moisture damage.

Check for Support Beams

Wall-hung units require fixing to support beams or noggins for solid wall backing.

Check for Plumb Walls & Level Floors

Ensure walls are plumb and floors are level to prevent operational issues and material stress.

Check Plumbing Positions Align with Product Interior Configurations

Verify plumbing positions and clearances behind drawers, considering water supply fittings.

IMPORTANT TIPS

Ensure Tiles Extend Behind Bathroom Furniture

Tiles should extend behind and beneath furniture to prevent moisture and mould build-up.

Seal Areas Where Cabinet Meets Wall/Floor

Seal all edges where the cabinet meets the wall and floor with neutral cure silicone.

VANITY INSTALLATION

1. LOCATION

Mark the vanity position considering top/basin thickness and ensure attachment to two support beams.

2. PREPARING THE CABINET

Remove doors/drawers, measure plumbing locations, and drill holes for plumbing and wall fastening.

3. LEVELING

Position the vanity, check for levelness, and pack if necessary to ensure it sits level and square.

5a. FIX TOP / BASIN

Apply silicone to edges and position the top/basin, ensuring overhang and level surface.

6. SEALING

Apply non-acidic silicone to edges where the vanity top meets the wall and floor.

4. SECURING THE CABINET

Fasten the cabinet securely to the wall through the back using appropriate screws/bolts.

7. ADJUST DOORS & DRAWERS

Install drawers and doors, then adjust them to align correctly.

8. CLEANING

Clean building residue from the cabinet and ensure drawer runners are free of debris.

DETACHABLE KICKBOARD INSTALLATION

Instructions for assembling and attaching the detachable kickboard.

1. JOIN SIDE PANELS

Join side panels with the rear panel using screws and cam-locks.

2. JOIN FRONT PANEL

Attach and fasten the front panel to each side panel, ensuring cam-locks are fastened.

3. ATTACH CENTRE SUPPORT (FOR LARGER UNITS)

For larger units, insert and secure the centre support panel with cams.

4. JOIN KICKBOARD TO VANITY

Fasten the kickboard to the vanity unit using cam-locks at the base.

PRESSED METAL DRAWERS

Detailed instructions for adjusting and installing pressed metal drawers.

DRAWER HEIGHT ADJUSTMENT

Adjust drawer front height by turning the back screw, then tighten the front screw.

DRAWER LATERAL ADJUSTMENT

Adjust drawer front alignment left or right by turning screws and tighten all screws.

REMOVING & INSERTING DRAWER

Guide on how to remove and insert drawers from the cabinet runners.

DRAWER FRONT REMOVAL AND INSTALLATION

Steps to remove and install the drawer front by loosening/tightening screws.

TROUBLESHOOTING - HOW TO RE-ENGAGE THE SOFT-CLOSE ADAPTER

Procedure to reset the soft-close adapter trigger if it is not working.

PREMIUM SOLID SIDED DRAWERS

Instructions for removing, inserting, and adjusting premium solid sided drawers.

REMOVING & INSERTING DRAWER

Steps to remove drawers by lifting the front and insert by aligning runners.

DRAWER HEIGHT ADJUSTMENT

Adjust drawer front height by turning the back screw, then tighten screws.

LATERAL ADJUSTMENT

Adjust drawer front position left/right by turning corresponding screws.

TILT ADJUSTMENT

Adjust drawer front tilt by turning screws located at the front and back.

DRAWER FRONT REMOVAL AND INSTALLATION

Guide to remove drawer fronts by unscrewing and reinstalling them.

DOOR HINGE ALIGNMENT

Instructions for side, depth, and height adjustment of door hinges.

SIDE ADJUSTMENT

Use front screw to move the door left/right or to level it.

DEPTH ADJUSTMENT

Use back screw to move the door inward or outward from the carcass.

HEIGHT ADJUSTMENT

Loosen mount plate screws to adjust door height, then retighten.

DOOR HINGE INSTALLATION

Steps for removing doors, installing hinges onto carcass, and replacing hinges on doors.

REMOVING & INSTALLING DOORS

Procedure to remove doors by releasing clips and install by pressing hinges into place.

REMOVING HINGE FROM DOOR

How to remove hinges from the door by releasing the top cover plate.

REPLACING HINGE ON DOOR

Guide to place hinges into door holes and secure by clicking the cover plate down.

UNIVERSAL PLUG & WASTE INSTALLATION

Instructions for installing the universal plug and waste components.

TO INSTALL

Steps for installing waste, including washers, seals, and securing the plug.

CARE & MAINTENANCE

TIPS

General advice on maintaining products, emphasizing ventilation and avoiding excessive moisture.

CABINETS

Cleaning instructions for cabinets, including removing scratches and noting water resistance.

ACRYLIC TOPS

Maintenance for acrylic tops, focusing on gentle cleaning and scratch removal.

CERAMIC TOPS

Care for ceramic tops, noting scratch limitations and potential visual distortions.

CHERRY PIE / FRIDAY HYBRID QUARTZ

Cleaning and care for specific benchtops, including stain removal and heat protection.

BAMBOO

Instructions for cleaning bamboo surfaces, emphasizing immediate spill cleanup.